Wheelhouse roof
Install two Solar panels
Plugs on all wiring to mast for quick disconnect
Cut wings on mast so it can laydown on roof
Install bracket for mast when down
Fender boards mounted
Passarell mounted
Alt mounting for GPS, Anammoter, and search light for low clearance
Life raft
Cutout in overhang for 16' vhf, alt to 4'
Install solar fans in hatches
Wheelhouse exterior
Mast step to roof
Sunscreen on windshield
Deck starting at bow
Replace rivits with pins to remove pulpit section bow rail
Install passerelle reciever at anchor pulpit
Install line holders in fwd lazaretts
Install 400' anchor chain, spare anchor in lazarette
Install  small cleats on toe rail at each chalk 
Supply jack lines running from fwd cleats back
Salt and fresh washdown fittings
Fabricate and install 'bunny bed' between rails
Fabricate bow rail height posts ( with and without mast)
Install Passerelle recievers port and starboard
Install deck access hatches over fuel tank fittings
Install mooring tape reel on bow or stern rail
Fwd Bilge
Install parallel macerator
Install platform for storage
Fwd stateroom
Install 12v outlet and fan
Install bus heater under bed
Midship Bilge
Relocate bilge pump to aft of compartment
Install hinges and air piston on stateroom floor hatches
Install vent line on water tank
Cockpit
Install rolling screen on bifold doorway
Install sreen/shade combo on rear window
Install 6 small cleats
Install rear windless, line feeds to engine room
Install recievers for grill
Install major cleats for towing
Supply snatch block for swim platform cleats
Cut rear transom door
Install SureShade
Add side and rear curtains to SureShade and mister line
Install epirp
Baths
Install built in hair dryers
Install dispensers in showers
Change cabinet door in master bath
Galley
Install Brew Express coffee maker
Change cabinet doors over cooktop
Fabricate and install wine glass rack
Fabricate and install spice rack
Rearrange glass cabinet shelving
Install shelving under sink
Rework storage under stairs for toaster oven
Underfloor - install rails for plastic storage tubs
Install hinges and air pistons on floor hatches
Main Saloon
Install velcroed screens on side windows
Remove bar and icemaker, longer settee and table
Install bus heater under settee
Install overhead rail length of cabin
Fabricate and install bookcase at windshield
Fabricate and install magazine rack
Crew cabin
Install second refrigerator/freezer
Convert double bed to single
Install wire rack shelving on starboard side behind mattress
Washer and Dryer orderd with boat
Helm
Install connecting plug for Cummin/zeus computer
Provide I-Pad mount with power supply
Install speed over water sensor
Install bow depth sounder
Install anchor rode counter
Add controls for aft windless
Electrical
Add A/B switch for cooktop on inverter power
Add A/B switch for hot water heater on inverter power
Move built in vac to inverter circuit
Install 220v/50cy battery charger with plug for and aft
Replace 4D house batteries with 8D
Replace 100 amp alt on port engine with 160 amp
Boat ordered with 3000w inverter
Wire in solar panels
Outlet on inverter in crew qt for washer and dryer
Engine room
Fabricate and install stand for tool box
Install second fresh water pump
Install sight glass on fuel tanks
Add second bilge pump in aft bilge
Install 12v water maker
Install mounts for spare prop behind port engine
Install hose reel
Repipe aft freshwater fill thru filter to tank
Add fitting on port fuel tank at crossover for alt feed to generator
Add petcocks on fuel filters
Fabricate a fitting for base of fuel tank for pumpout or transrfer
Add fitting on air horn tank for filling fenders, etc.
Add filter rack
Boat certified to EU standard and plaque installed